North Rd at Wisteria Dr Intersection Improvements
This project is an intersection improvement project to reduce traffic congestion by adding a turn lane and upgrading signal, lighting, storm drain network and existing road surface.
- Scope of Work: Grading, Concrete Flatwork, Retaining Walls, Handrail, Storm Drain, Asphalt Milling/Paving/Levelling, Lighting, Signal, Signing and Marking, Landscaping, Utility relocation
- Project Owner: City of Snellville
Stone Mountain Hwy at E Park Place Blvd
This roadway widening project consists of introducing an additional right turn lane to improve vehicular traffic conditions.
- Scope of Work: Grading, Concrete Flatwork, Concrete P Walls, Storm Drain, Asphalt Milling/Paving, Signal, ITS, Signing and Marking, Utility Relocation
- Project Owner: Gwinnett County
Roswell St Pedestrian Safety Improvements
This project is a pedestrian safety improvement project on Roswell St from Old Milton Pkwy to Old Roswell St.
- Scope of Work: Grading, Concrete Sidewalk/Driveways, Wall Veneer, Erosion Control, Traffic Control, Storm Drain, Asphalt Mill/Inlay, Lighted Bollards
- Project Owner: City of Alpharetta
Camp Creek Pkwy at Butner Rd / Old Fairburn Rd
These GDOT quick response projects comprise extension of left turn lanes on both intersections to improve roadway traffic movement.
- Scope of Work: GAB Work, Subgrade Preparation, Grading, Asphalt Milling/Paving/Levelling, Signing and Marking, Cable Barrier Installation
- Project Owner: Georgia Department of Transportation
City Pond Road at Williams Road Intersection Improvements
This project was an intersection improvement project to install a right turn lane at the intersection of City Pond Rd and Williams Rd. Project was completed in 90 days as per the tight timeline provided by the City of Covington.
- Scope of Work: Grading, GAB Work, Asphalt Milling/Paving , Concrete Flatwork, Storm Drain, Signage, Striping, RRFB Installation, Traffic Control
- Project Owner: City of Covington
Hugh Howell Road Sidewalk Construction Project
This project is a 0.59 miles long sidewalk construction project on Hugh Howell Rd from Lawrenceville Highway to Mountain Industrial Blvd.
- Scope of Work: Grading, Concrete Flatwork, Retaining Wall, Handrail, Erosion Control, Traffic Control, Storm Drain Structures, Pavement Markings
- Project Owner: City of Tucker
Lawrenceville Highway Sidewalks Project
This project is a 0.37 miles long roadway improvement project on Lawrenceville Highway.
- Scope of Work: Grading, GAB Work, Curb and Gutter, Sidewalk, Erosion Control, Traffic Control, Handrail, Storm Drain Pipe, Catch Basin, Guardrail
- Project Owner: City of Lawrenceville
Sounding of Fiber Conduits @ North Carolina
This utility project consists of sounding fiber conduits (approx. 8000 ft) owned by Facebook in Mt. Airy, North Carolina.
- Scope of Work: Vault Location and Station Markings at 20 ft interval, Final Plans and Photos (using solocator) as Per Specifications
- Project Owner: Facebook / FiberLight
Traffic Pacing @ I-20 East Expy
This temporary traffic control project involved planning and execution of 10 minute traffic pacing operation for removing an old internet cable spanning across I-20 East Expy in Dekalb County, Georgia.
- Scope of Work: Traffic Pacing Plan for GDOT Approval, Coordination with Law Enforcement Agencies, Traffic Pacing Execution, Standard Flagging Operation
- Project Owner: Comcast / Comtrac Services